Saudi HORECA Riyadh, the hospitality, food and beverage show organised by SEMARK, opens on 7 December 2026 and runs to 9 December, together with Host Arabia and Salon du Chocolat et de la Patisserie. Unlike most organisers, this one publishes its exhibitor manual openly, so a Saudi HORECA exhibition stand can be drawn against written rules: the drawing scale, the maximum heights, what may not be done inside the hall. This page collects those published rules with their source, says where the 2026 manual may differ from the 2025 one we read, and counts the build back from opening day. We design the stand, build it in our own factory and install it in Riyadh with our own team.
The dates are from the organiser's exhibitor registration page. The stand rules further down are from the exhibitor manual the organiser publishes on its site, which on the day we checked was the 2025 edition: the 2026 manual sets its own dates and may change a detail. Every entry in our exhibitions calendar follows the same rule, official pages only.
| Dates | 7 to 9 December 2026 |
|---|---|
| Venue | Riyadh Front Exhibition and Conference Center |
| City | Riyadh |
| Organiser | Semark |
| Sector | Hospitality, food and beverage |
| Official page | saudihoreca.com |
| Held together with | Host Arabia and Salon du Chocolat et de la Patisserie Riyadh |
|---|---|
| Live features | Salon Culinaire, a barista competition, a mocktail competition and Saudi Elite Chefs |
| Licence | Organised by SEMARK under a licence agreement with Hospitality Services, the company behind the HORECA shows of the region |
| Stand options the organiser sells | Shell scheme, space only and double decker, each priced by position: inline, corner, peninsular or island |
| Minimum bookings | Shell scheme from 12 square metres (3 by 4), and space only for stands over 24 square metres, as listed on the booking page |
| Venue named in the 2025 manual | Riyadh Front Exhibition and Conference Center, on King Khalid International Airport Road |
| Opening hour on the organiser's countdown | 4pm on 7 December 2026 |
Official sources we read: Saudi HORECA Riyadh, organiser site, Exhibitor registration page, General booth information, Exhibition manual (PDF). Sources last checked: 12 November 2026.
These points are taken from the HORECA Riyadh exhibitor manual published on the organiser's site (2025 edition). Treat them as the baseline and check the 2026 manual when your contract arrives: the principle rarely changes, the dates always do.
Exhibitors who build their own stand submit a detailed 1:100 scale drawing for approval at least one month before the show: ground plan, elevations, 3D views, total stand weight, the materials to be used and the contractor's contact details. Building does not start without the approved drawings.
The manual provides for an inspection during the build to check the stand against the venue's rules, and says a stand that fails may be stopped. This is one reason we test assemble every stand in the factory first.
Space only stands may not exceed 3.5 metres without the organiser's written permission. Where a space only stand backs onto a shell scheme row the limit is 2.66 metres, and an island stand may have half closed sides up to 4 metres, with anything higher needing approval. A platform counts towards the total height.
On space only, the exhibitor provides the floor covering and the rear and side walls, at a minimum height of 2.5 metres, and the back of any wall a neighbour or an aisle can see must be finished. No fascia is supplied: the stand itself must show your name and stand number to the aisles.
No drilling, nailing, adhesive or paint on the floor, walls or columns, and nothing hung from the ceiling without prior approval and payment. Double sided carpet tape has to be fully removed afterwards, and damage is charged to the exhibitor.
Welding, spray painting, grinding and machine cutting of wood, metal or stone are prohibited inside the hall, and only electric lifts are allowed. A stand therefore has to arrive prefabricated and finished, which is how we build in any case.
On an island site the manual restricts walls: they sit at least 2 metres in from the perimeter, as centrally as possible, and the stand must be accessible from every side. The organiser also asks all stands to be widely open to the aisles.
Materials must be fireproofed to local regulations. Electricity is ordered through the organiser's stand contractor, with single phase and three phase supply and British standard sockets, and a copy of the exhibitor's insurance policy is required a week before build up.
In the 2025 edition the build up opened two days before the show and stands had to be complete the night before opening, with dismantling starting the moment the show closed. Expect the same shape in 2026 and take the exact hours from the new manual. A second level has rules of its own, explained in our guide to double deck exhibition stands.
HORECA exhibitors sell to hotels, restaurants, cafes and caterers. The product is equipment, ingredients or a service, and the stand type follows from which of the three it is.
For coffee roasters, machine brands and syrup makers: a real bar with machines plumbed and powered, a queue line and seating for a few buyers. The water and drainage points in the hall floor decide where the bar can sit.
Ovens, refrigeration and dishwashing lines shown as a working kitchen run. Heavy units need the floor load checked and early delivery: the manual sets an earlier deadline for heavy exhibits.
China, glass, cutlery, linen and packaging read best as laid tables and lit shelves, not as stacked stock. Shallow shelving, warm light and one dressed table per collection.
Ingredient and food service brands need a chef, a pass and a counter where buyers eat standing. Compact induction equipment keeps the stand inside the hall's rules.
Starting from the 12 square metre shell the organiser fits out. Nothing may be fixed to its panels, so we add free standing graphics, a counter, shelving and lighting that stand or hang without a single screw in the system.
The organiser sells double deck space as its own category. A meeting level above a display floor suits distributors with many principals. It needs structural drawings and the organiser's approval well ahead.
Counted back from the opening date. With under four weeks left, the custom stand dates have passed for 2026 and the table says so plainly. What remains realistic is in the box under it. If you are planning for the next edition, the same table is your schedule, and our guide to how long an exhibition stand takes explains each stage.
| Date | Stage | Status |
|---|---|---|
| 12 October 2026 | The brief, the space contract and the exhibitor manual in hand: a custom stand starts here | Passed |
| 26 October 2026 | Design approved, and drawings sent to the organiser where it asks for them | Passed |
| 9 November 2026 | Last sensible start for a modular stand with new graphics | Passed |
| 16 November 2026 | Graphics go to print on the final panel sizes | This week |
| 23 November 2026 | Full test assembly in the factory, and the last start for a rental kit from stock | Ahead |
| 30 November 2026 | Transport booked for the build window the organiser sets | Ahead |
| · | Installation in the hall, inside the hours written in the exhibitor manual | Per the exhibitor manual |
| 7 December 2026 | Opening day | Ahead |
| 9 December 2026 | Closing, then dismantling in the organiser's window | Ahead |
What is still realistic for this edition · 25 days to openingThe realistic option now is a rental kit from stock with new graphics, or an upgrade of the shell scheme the organiser hands over.
Status worked out on 12 November 2026.
Notes from building for buyers who cook, pour and serve for a living.
A chef does not buy an oven that is switched off. Plan power, water and extraction so the equipment works during the show, and order those services with the stand drawings, not after.
The show opens in the afternoon and fills in the evening. Meetings happen early and the demonstrations draw later, so the stand needs a quiet table and a busy counter at the same time.
The manual asks for screens to be viewed from inside the stand so that crowds do not block the aisle. Face the demonstration inwards and the queue becomes your audience.
The organiser decides the acceptable sound level if a neighbour complains. A good demonstrator with a headset at low volume beats a loudspeaker that is switched off on day one.
Because walls visible to neighbours and aisles must be finished, the reverse of your stand is free advertising. Brand it.
Cups, plates and tasting spoons leave the kitchen through one opening and come back through another. Without that, the chef works in a crowd.
The show is in Riyadh, so read how build windows, our install team and the Riyadh venues work on our page about exhibition stands in Riyadh, and how we run launches and hospitality evenings on events in Riyadh. The other hospitality and food dates of the season, each with its official source, are in the Saudi exhibitions calendar. Budget lines with figures are in the guide to exhibition stand cost in Saudi Arabia, lighting for food and equipment is covered in exhibition stand lighting, and the final month is ordered in the thirty day exhibitor checklist. For a short lead time start with modular and portable stands, and for a full build see custom exhibition stands.
Each of these traces back to a line in the manual that was read too late.
The higher limit is for island stands with half closed sides. Inline and corner stands work to 3.5 metres, and to 2.66 where they back onto shell scheme.
The manual asks for them a month ahead. Late drawings are approved late, and the build cannot start without the approval.
No cutting, grinding or spray painting in the hall means no adjustments by machine. Whatever was not test fitted in the factory is fixed by hand at midnight.
The policy copy is due a week before build up, and the manual says building does not begin without it.
Damaged panels are charged to the exhibitor. Shell upgrades have to be free standing or hung from the system's own fittings.
The platform is counted in the total stand height. A tall display on a raised floor can breach the limit by the thickness of the floor.
The team that draws your stand builds it in our own factory, test assembles it complete with lighting and graphics, and installs it in Riyadh. Our stands and displays have stood for the Heritage Commission, Ascenda, Swarovski, Gucci and Saudia among others. We are an independent builder: the organiser names its own official stand contractor in the manual, and we work for exhibitors who appoint us for their own space.





Answered from the organiser's published pages wherever one exists.
From 7 to 9 December 2026, according to the organiser's exhibitor registration page, and the countdown on its home page runs to 4pm on the first day. It is held with Host Arabia and Salon du Chocolat et de la Patisserie.
SEMARK, the Saudi Event Management and Marketing Company, under a licence agreement with Hospitality Services, which runs the HORECA shows of the region.
In the manual published by the organiser, 3.5 metres for space only stands unless it gives written permission, 2.66 metres where the stand backs onto shell scheme, and up to 4 metres for half closed sides on an island. Check the 2026 manual before the design is fixed.
At least one month before the show, at 1:100 scale, with plan, elevations, 3D views, total weight, materials and the contractor's details. We prepare and send this package as part of the stand.
Not for a custom stand. A rental kit from stock with new graphics, or an upgrade of your shell scheme, can still be ready, provided the organiser accepts the paperwork at this stage.
The organiser sells double deck space as a category. It needs structural drawings, the organiser's approval and more lead time, so it is a project for the next edition, not for this month.
The floor area. The manual says the walls, the floor covering and the display of name and stand number are the exhibitor's, and electricity is ordered separately through the organiser's stand contractor.
No. The organiser has its own official stand contractor. We are an independent stand builder with our own factory, working for exhibitors on the space they have booked and inside the manual's rules.
Send your stand number, the space size and what has to run on the stand. Within 24 hours you have an itemised quote, a first concept and the dates that matter, counted back from 7 December.
Most projects here combine more than one service. This is the full range, with the ones closest to this page first.