LEAP returns to the Riyadh Exhibition and Convention Center in Malham from 12 to 15 April 2027, with the DeepFest AI event alongside it. The organiser, Tahaluf, reports more than 175,000 attendees and 1,500 exhibiting tech brands, and says stand space sells out. A LEAP exhibition stand is therefore built for a crowd, not for a quiet aisle: screens that still read when visitors stand ten deep, demos that survive a busy hall network, and a meeting room where people can hear each other. With five months to opening, this is the moment when a custom stand can be planned properly. Below are the official facts, what is and is not published about stand rules, and a countdown from opening day.
From the organiser's site. The hours in the table are those the organiser published for its 2026 edition and are given as a guide until the 2027 hours are announced. We check every entry in our exhibitions calendar again each month.
| Dates | 12 to 15 April 2027 |
|---|---|
| Venue | Riyadh Exhibition and Convention Center, Malham |
| City | Riyadh |
| Organiser | Tahaluf |
| Sector | Technology and startups |
| Official page | onegiantleap.com |
| Runs alongside | DeepFest, the artificial intelligence event held with LEAP |
|---|---|
| Visitor hours at the 2026 edition | 1pm to 9pm each day, as published by the organiser |
| Exhibitor access at the 2026 edition | 9am to 9.30pm daily, to prepare the stand before and after opening |
| Scale the organiser reports | More than 175,000 attendees, 1,500 tech brands and 1,200 startups |
| Themes | Artificial intelligence, cloud and data, cybersecurity, fintech, health technology, smart cities, gaming and more |
| Startups | A dedicated Startup and Scaleup Programme with its own spaces, separate from standard exhibition stands |
| Audience | A professional event for visitors aged 18 and over |
Official sources we read: LEAP, organiser home page, Exhibit at LEAP 2027, LEAP frequently asked questions. Sources last checked: 12 November 2026.
Tahaluf does not publish the LEAP exhibitor manual on the open web: it reaches exhibitors with the contract. So nothing below is quoted from it. These are the matters an organiser of a show this size normally regulates, and the questions to put to your account manager the day the manual lands. We read the document itself before drawing anything.
The large stands at LEAP are built on bare floor. Organisers of shows of this scale normally ask for stand drawings, structural details for anything tall or with a second level, and the builder's registration well before the build. Ask for the submission deadline first, because every other date hangs from it.
Tall towers, hanging banners and suspended lighting are what make a stand visible across a hall this large, and they are exactly what needs approval and an order placed with the venue's rigging provider. Decide them in the concept, not in the last fortnight.
Video walls, servers and demonstration hardware draw far more than a lit counter. The electrical order is calculated from the equipment list and placed with the organiser in advance, with a separate supply for anything that must stay on overnight.
Shared wifi in a hall with this many people is not something to run a live demonstration on. A wired line is ordered through the organiser, and the demonstration should have an offline mode in any case.
The venue is north of Riyadh, so transport times, the build team's travel and the delivery slots for trucks are planned around the organiser's traffic and access plan, which comes with the manual.
Exhibiting through the Startup and Scaleup Programme means a pod or kiosk the organiser provides. What we add there is graphics within its template, a counter display and a screen on a stand, not a build.
A second level or a hung structure brings approvals of its own. Our guide to double deck stand rules explains what organisers and venues usually ask for before they sign one off.
Tech exhibitors differ less by product than by what they want a visitor to do: watch, try, or sit down and talk.
A central store and server room with demonstration desks on the open sides, each with its own screen and a presenter. Visitors try the product standing, and staff can step out of the crowd.
A small stage with a large screen and a few rows of standing room, running short talks on the hour. It draws a crowd by itself and needs the sound kept inside the stand.
For enterprise vendors: a branded front with one hero screen, and behind it enclosed meeting rooms with real acoustic separation and hospitality.
A darkened or enclosed space for immersive, robotics or hardware demonstrations, with a managed queue outside it.
Many companies under one identity: equal pods, a shared stage and a shared meeting area, with each company's name readable from the aisle.
A small space with a single lit message, one demonstration and two stools. At a show this busy, one clear idea outperforms six screens.
Counted back from the opening date. Every stage is still ahead, which is rare enough to be worth using: the design can be approved by one person in one round, and the stand can be tested complete before it leaves our factory. Each stage is explained in how long an exhibition stand takes.
| Date | Stage | Status |
|---|---|---|
| 15 February 2027 | The brief, the space contract and the exhibitor manual in hand: a custom stand starts here | Ahead |
| 1 March 2027 | Design approved, and drawings sent to the organiser where it asks for them | Ahead |
| 15 March 2027 | Last sensible start for a modular stand with new graphics | Ahead |
| 22 March 2027 | Graphics go to print on the final panel sizes | Ahead |
| 29 March 2027 | Full test assembly in the factory, and the last start for a rental kit from stock | Ahead |
| 5 April 2027 | Transport booked for the build window the organiser sets | Ahead |
| · | Installation in the hall, inside the hours written in the exhibitor manual | Per the exhibitor manual |
| 12 April 2027 | Opening day | Ahead |
| 15 April 2027 | Closing, then dismantling in the organiser's window | Ahead |
What is still realistic for this edition · 151 days to openingThere is time for a custom stand on the normal schedule, provided the design is approved on its date.
Status worked out on 12 November 2026.
What we would build in, knowing how crowds behave at large technology shows.
In a dense crowd anything below shoulder level disappears. The headline and the main screen sit high. Touch screens and keyboards sit at the edge, where one person can reach them.
Networks at big shows fail at the worst moment. A recorded or local version, switchable in seconds, saves the day more often than any spare cable.
Four days of giveaways, laptops, bags and staff belongings need a locked room. Without one they end up under the demonstration desk, on camera.
A roofless meeting room in a loud hall is a place to shout. A ceiling, soft surfaces and a door make it a place where a deal can be discussed.
A raised floor hides the cabling for every screen and desk, and lets a station move during the build without a visible cable.
Long open hours across four days wear a team down. A small back area with water and seats keeps the people at the front worth talking to.
LEAP is a Riyadh show, so the practical side of building there, from the build window to the team on site, is on our page about exhibition stands in Riyadh, and side events and launches during the week are covered on events in Riyadh. The other technology dates of the season, with official sources, are in the Saudi exhibitions calendar for 2026 and 2027. For the budget, read the guide to exhibition stand cost in Saudi Arabia. For screens and light together, read exhibition stand lighting, and for the month before opening, the exhibitor checklist. The full service is on custom exhibition stands, and smaller budgets can start from modular stands.
All six are cheap to avoid in January and expensive to fix in April.
The best positions go early, and so do builders' calendars for April. A stand briefed in January is drawn calmly. One briefed in March is drawn around what is still possible.
Product architecture diagrams do not read from an aisle. One sentence that says what the product does, in letters a person can read from across the gangway.
Three loops with audio become noise. One source of sound per stand, and subtitles on everything else.
A popular demonstration with nowhere to queue blocks your own stand and annoys the neighbour. Mark the line inside your space.
Dark gloss surfaces show every fingerprint and reflect every light of the hall into the cameras. Matt surfaces photograph better.
Badge scanning, a form or a QR code needs testing on the stand's own network before opening day, not during the first rush.
Our stands and displays have stood for the Heritage Commission, Ascenda, Swarovski, Gucci and Saudia among others. Every stand is drawn, built and test assembled, screens and lighting included, in our own factory and installed by the same team in Riyadh. We are an independent builder working for exhibitors on the space they have booked with the organiser. We are not an official contractor of LEAP.





What exhibitors ask in the months before the show.
From 12 to 15 April 2027 at the Riyadh Exhibition and Convention Center in Malham, according to the organiser's site. DeepFest runs alongside it.
Tahaluf, with its government partners. Space is booked through the organiser's exhibit enquiry form, and startups apply through a separate programme.
No. It is issued to contracted exhibitors. We ask for your copy with the brief and design to it. Nothing on this page is presented as a quotation from it.
For a custom stand, eight weeks before opening is the working minimum, and ten for an island or a second level. Because the organiser's own deadlines for drawings come earlier, briefing in January is comfortable.
We design the stand around the screens, build the structure, the power routes and the mounting for them, and coordinate with your AV supplier or ours. The content stays with your team.
A pod leaves little room, and that is fine: a printed back panel within the organiser's template, a small counter display and a screen on a stand. It can be ready in days.
The space size and open sides, the exhibitor manual when you have it, a list of what must run on the stand, and the number of meeting seats. An itemised quote and a first concept follow within 24 hours.
Yes. The stand is built in our own factory and reaches Malham ahead of the build window, and the team that built it installs it, stays for the opening and dismantles it after the show closes.
Send your space size, the open sides and what has to run on the stand. Within 24 hours you have an itemised quote, a first concept and a schedule counted back from 12 April.
Most projects here combine more than one service. This is the full range, with the ones closest to this page first.