Jeddah Construct returns from 22 to 24 March 2027 at the Jeddah International Exhibition and Convention Center, open from 4 PM to 10 PM each day. The organiser, dmg events, presents it as the show that unites the construction industry of the Western Province, and says the 2027 edition will bring together 200+ exhibitors from 25+ countries and 13,000+ professionals. That makes a Jeddah Construct exhibition stand a different job from a booth at a giant national fair: three evenings, a regional crowd of contractors, consultants, architects and developers, and visitors who come to compare finishes and fittings with their own hands. Counted from mid November 2026 there are a little over four months to opening, enough for a custom booth on the normal schedule. This page gives the official facts, what a materials supplier should put on show, the booth types that fit a three day regional event, and a countdown from opening day.
Dates, hours and venue come from the organiser's own site, and the figures in the table are the ones it gives for the 2027 edition. Its exhibitor manual and its stand packages are not on the open web, so no line here is quoted from them. Every date in our exhibitions calendar is read from an official page in the same way.
| Dates | 22 to 24 March 2027 |
|---|---|
| Venue | Jeddah International Exhibition and Convention Center |
| City | Jeddah |
| Organiser | dmg events |
| Sector | Construction |
| Official page | jeddahconstruct.com |
| Opening hours | 4 PM to 10 PM daily, as published by the organiser |
|---|---|
| Powered by | Big 5 Construct Saudi, the national construction show run by the same organiser |
| Scale the organiser gives for 2027 | 200+ exhibitors from 25+ countries, 3,500+ products and 13,000+ professionals, on 8,000+ square metres |
| Who attends, in the organiser's words | Contractors, engineers, consultants, architects and developers working on projects in Jeddah, Makkah and Madinah, with distributors and government representatives |
| Market it serves | The Western Province, where the organiser cites a project pipeline worth 692 billion US dollars |
| Product sectors include | Building interiors and finishes, marble and stone, windows, doors and facades, MEP services, HVAC-R, concrete and cement, metal and steel, intelligent buildings, urban design and landscape |
| On the floor besides the booths | Construct Talks, a CPD certified conference programme, the Architects Club and the Engagement Zone |
| Previous edition | The second edition, in September 2025, was held at the Jeddah Superdome, so 2027 brings a change of venue |
| Admission | Free for trade and industry professionals. Visitors under 18 are not admitted |
Official sources we read: Jeddah Construct, organiser home page, Why exhibit at Jeddah Construct, Why visit Jeddah Construct, Stand booking request, Construct Talks, Organiser news on the 2025 edition. Sources last checked: 12 November 2026.
dmg events sends the exhibitor manual to contracted exhibitors and does not post it publicly. Its site takes bookings through a request form, which the sales team answers with availability, pricing and next steps. So this section quotes no rules. It lists the points that shape a building materials booth and that only the manual for the 2027 edition can settle. Send us the manual with your brief and we design to it.
The 2025 edition stood in the Jeddah Superdome and the 2027 edition is announced for the Jeddah International Exhibition and Convention Center. Height limits, rigging points, the floor plan and delivery routes belong to the building, so nothing measured last time carries over. Ask for the 2027 floor plan and technical rules before a drawing is reused.
Organisers usually sell floor space alone or space fitted with a shell scheme, and what the fitted option contains differs from show to show. Ask for the list: walls, fascia, carpet, sockets, spotlights and furniture. An upgrade is planned around that list, and around whether anything may be fixed to the panels.
A bathroom or bedroom vignette looks right with a ceiling and unfinished without one. Covered areas inside a booth are commonly subject to fire safety conditions and prior approval. Ask what applies before the design is fixed, because the answer decides whether your room sets are roofed, slatted or left open.
Sanitaryware sells when water runs. Whether the hall offers a water supply and a drain to a booth, and by which order deadline, is a question for the manual. Where it does not, a closed loop with a concealed tank and pump can be built into the plinth, needing only a socket.
A lighting display is many small loads that add up. The electrical order goes to the organiser as a calculated load taken from the fitting schedule, with switching and dimming planned inside the booth. An order placed late leaves any surcharge, or a refusal, in the organiser's hands.
An outside booth builder is normally registered with the organiser, with drawings, insurance and staff passes handed in by a deadline. As doors open at 4 PM, ask also whether exhibitors may enter earlier on show days to restock samples and clean.
We prepare the drawings and the paperwork the organiser and the venue ask for. The approvals are theirs to give. The last month before opening is set out form by form in our exhibitor checklist.
A regional show rewards a booth that is quick to build, dense with real product and easy to staff for three evenings. These are the formats we would put forward, from the lightest to the fullest.
The fitted space the organiser hands over, turned into a small showroom: printed wall panels, a sample rail, a lit counter and better spotlights. Ready in 2 to 3 weeks, and a sensible first step for a supplier testing the western region.
On 9 or 18 square metres an agent needs little: the names of the brands represented, readable from the aisle, a single built detail for each brand, and a table for taking enquiries. Storage hides behind the back wall.
A reusable frame system carries the walls and the lighting, and joinery made in our factory slots into it as room corners: a basin wall, a bay of flooring with its skirting, a door hung in its frame. New graphics take 2 to 4 weeks, and the kit returns to our storage for the next show.
At around 36 square metres there is room for a walk through: a row of room sets along the back, a sample library in the middle and a meeting table at the quiet end. Built in 6 to 8 weeks from brief to opening.
Several manufacturers under one local agent share a roofline, a floor and a reception, and each keeps a bay in its own name and colour. The visitor reads a single address for all of them, which is what a contractor wants.
A darker shell with a controlled ceiling for luminaires, or a tiled wet wall for brassware. Fewer products than the catalogue holds, each installed the way it would be on site.
The table counts back from the opening date. In mid November 2026 every stage is still ahead, so the brief for a custom booth can be written without hurry, and a modular booth or a shell scheme upgrade can wait for the new year if it must. Samples are what exhibitors underestimate: they have to be in our factory for the test assembly, not at sea. Each stage is explained in how long an exhibition stand takes.
| Date | Stage | Status |
|---|---|---|
| 25 January 2027 | The brief, the space contract and the exhibitor manual in hand: a custom stand starts here | Ahead |
| 8 February 2027 | Design approved, and drawings sent to the organiser where it asks for them | Ahead |
| 22 February 2027 | Last sensible start for a modular stand with new graphics | Ahead |
| 1 March 2027 | Graphics go to print on the final panel sizes | Ahead |
| 8 March 2027 | Full test assembly in the factory, and the last start for a rental kit from stock | Ahead |
| 15 March 2027 | Transport booked for the build window the organiser sets | Ahead |
| · | Installation in the hall, inside the hours written in the exhibitor manual | Per the exhibitor manual |
| 22 March 2027 | Opening day | Ahead |
| 24 March 2027 | Closing, then dismantling in the organiser's window | Ahead |
What is still realistic for this edition · 130 days to openingThere is time for a custom stand on the normal schedule, provided the design is approved on its date.
Status worked out on 12 November 2026.
Visitors here specify or buy materials. They touch, compare and ask for the data sheet. A booth earns its space by making all of that easy.
Loose tiles and swatches on a table are picked up, mixed up and carried off. A library keeps each sample in a labelled slot or drawer with its code, its finish and a QR code, at a height where visitors can look at it together.
Flooring is judged underfoot. Lay the product as the booth floor in clean zones, with real thresholds and skirting, and visitors test it before anyone speaks to them.
A basin on a plinth at the wrong height is a sculpture. Mount it on a tiled wall with its mixer, waste and mirror, at installation height, and with water running where the hall allows.
A luminaire switched on in a bright hall proves little. Show it in a niche, washing a wall or over a worktop, on a dimmer the visitor can turn, with the hall light screened from above.
Wall panels, doors, ironmongery and paint read best as the finished corner of a room. A visitor sees how the products meet each other, which a row of hanging boards never shows.
Consultants and architects want paper and files, not a pitch. Give them a standing table with the catalogues, a QR code for each product family that opens the data sheet itself, and someone technical who can talk standards and submittals.
Jeddah sits on the Red Sea, and buyers here ask how a product stands up to humidity and salt air. Put the evidence on the booth wall: the test report, a section cut open to show the coating, and where you have it, a piece that has served on a coastal site beside a new one.
One person at the edge of the booth greets, asks what the visitor is building and in which role, scans the badge and walks them to the right colleague. The sales team then spends its evening with buyers.
Three evenings pass quickly. Invite the contractors and consultants you want by name in the weeks before, give each a time at the booth and keep a table free for them. The mornings, before the 4 PM opening, are for calls at their offices and sites.
Jeddah Construct is a Jeddah show, so the practical side of building in the city, from access to the halls to the install team, is on our page about exhibition stand builders in Jeddah, and a launch evening or a dinner for your distributors during the week is covered on event management in Jeddah. The other construction dates of the season, with the organiser of each, are in the Saudi exhibitions calendar for 2026 and 2027. To plan the budget line by line, read exhibition stand cost in Saudi Arabia. If the lead time is short, start from modular and portable stands, and for a full build see custom exhibition booths. Product lighting has a guide of its own, exhibition stand lighting.
None of these costs money to avoid. Each one costs enquiries when it is left in the booth.
Every range on the wall means no range is seen. Choose the products that suit housing, hospitality and mixed use projects in the western region, and show those built in.
Words such as corrosion resistant or suitable for coastal use invite a question. If the tested piece and its report are not on the booth, the claim works against you.
A consultant who scans a code wants that product's data sheet, in a file that can be forwarded. Test every code on a phone, on mobile data, before the graphics go to print.
A supplier new to this market is asked the same things all evening: who is your agent, where is the stock, how long is delivery. With no answer the visitor leaves with a brochure and nothing to order. Settle it before the show, even provisionally, and print it large near the reception.
Engineers ask about standards, loads and installation. Without a technical person on the booth each evening, the serious visitor is told that someone will call back.
The venue has changed. A drawing made for the earlier hall may break a height limit or face the wrong aisle. Plan again on the new floor plan, even when the kit itself is reused.
Our stands and displays have stood for Kinan, the Heritage Commission, Saudia Holidays, Johnson & Johnson MedTech and Cartoon Network. Design, CNC and laser cutting, joinery, paint, acrylic and large format print sit under one roof, so the tiled wall, the sample drawers and the lit sign of the same booth are made by one team and fitted together before they travel. Every booth is fully test assembled in our factory, with your samples in place, then installed by our own team, who stay for the opening and dismantle after the close. Our head office is in Jeddah. We are an independent builder working for exhibitors on the space they have booked. We are not an official contractor of Jeddah Construct or of the venue.





Asked by suppliers, agents and marketing managers preparing for March 2027.
From 22 to 24 March 2027 at the Jeddah International Exhibition and Convention Center, according to the organiser's site. It is open from 4 PM to 10 PM on each of the three days.
dmg events, the organiser of Big 5 Construct Saudi, and the site describes the Jeddah show as powered by that event. Space is requested through a booking form on the official site, and the organiser's team replies with availability and pricing.
The organiser names contractors, engineers, consultants, architects and developers working on projects in Jeddah, Makkah and Madinah, together with distributors and government representatives. Admission is free for trade professionals, and visitors under 18 are not admitted.
Not on the open web. It reaches exhibitors once they have contracted, and it is the document that states build heights, deadlines and build hours for the 2027 venue. We ask for your copy with the brief, and nothing on this page is quoted from it.
Yes. A custom booth takes 6 to 8 weeks from brief to opening, and in mid November 2026 the opening is a little over four months away. A brief received by the last week of January still sits on the normal schedule, and an earlier one makes sample deliveries easier.
It depends on how many products have to be shown built in. On 9 square metres a single vignette and a sample rail fit, on 18 there is room for a second vignette and a table, and 36 allows a row of room sets with a specification corner.
Often, yes. If the organiser offers water and drainage to the booth, the wet wall is designed around those points. If not, a recirculating loop with a hidden tank can be built in, provided the manual permits water on the booth. Either way the wet area is tested in our factory first.
For an agent, one shared booth usually works harder: a single reception, one host and one meeting table, with a bay for every brand. Separate booths make sense only when the brands sell to different buyers.
A modular kit can, with new graphics in 2 to 4 weeks. The layout has to be drawn again for the new venue and its rules, because the earlier edition was held in a different building.
The space size and its open sides, the product list with what must be shown working, and the manual when you have it. An itemised quote follows within 24 hours, and where transport applies it is a named line in that quote.
Send your space size, the open sides and the products you want shown built in. Within 24 hours you receive an itemised quote, a first concept for the booth and a schedule counted back from 22 March. Call 0567069088 or write to us on WhatsApp.
Most projects here combine more than one service. This is the full range, with the ones closest to this page first.