CPHI Middle East runs from 26 to 28 April 2027 at the Riyadh Exhibition and Convention Center in Malham. Informa Markets organises it, the show's own site presents it as part of the Tahaluf brand, and the exhibitor brochure places it under the patronage of the Ministry of Health. For 2027 the organiser expects 60,000 visitors and more than 1,000 exhibiting brands from over 110 countries. A CPHI Middle East exhibition stand is planned differently from a booth at a consumer or construction fair, because a pharmaceutical trade show is a meetings show held under compliance rules. Exhibitors come to sit down with suppliers, licensing partners and distributors, mostly by appointment, and what may be shown on the walls or handed across the counter is settled by a regulatory team before a designer draws a line. Counted from mid November 2026, opening day is a little over five months away, so every booth type is still open, a second level included. This page sets out the official facts, what the organiser publishes and what it keeps behind a login, the booth types that suit a pharma exhibitor, and a countdown from opening day.
Every line in the table was read on the organiser's own pages, in its 2027 exhibitor brochure and on the site of the co-located BIO Middle East, on the date printed under the table. Where two official pages disagree we report both and do not pick one. The other dates of the season are in our exhibitions calendar, each with its source.
| Dates | 26 to 28 April 2027 |
|---|---|
| Venue | Riyadh Exhibition and Convention Center, Malham |
| City | Riyadh |
| Organiser | Informa Markets |
| Sector | Pharmaceuticals |
| Official page | cphi.com/Middle-East/en/home.html |
| Visitor hours | 10 AM to 7 PM on 26 and 27 April, and 10 AM to 6 PM on 28 April, as given on the organiser's travel page and in its visitor FAQ |
|---|---|
| Exhibitor access on show days | From 9 AM, until 8 PM on the first two days. For the last day one official page gives 7 PM and another 6 PM, so take the hour from the Customer Center |
| Patronage and brand | The brochure states the patronage of the Ministry of Health. The site presents the show as part of the Tahaluf brand, alongside LEAP |
| Scale the organiser expects for 2027 | 60,000 visitors, 1,000+ exhibiting brands, 110+ countries, 400+ speakers and 80,000+ square metres of exhibition space |
| Previous edition, per the brochure | The 2024 debut drew 31,000+ attendees and 400+ exhibitors from 100+ countries. 75% of exhibitors rebooked on site, and more than 50% of those at least doubled their space |
| Tracks, in the organiser's names | Machinery and equipment, finished dosage, packaging and drug delivery, contract services, API, excipients, integrated pharma, natural extracts, fine chemicals, bioprocessing and manufacturing, drug discovery and development |
| Alongside the main halls | BIO Middle East, a co-located biotechnology event with scheduled partnering meetings, and a Nutraceuticals sector powered by Vitafoods |
| Features on the floor | Biotech zone, Pharma Innovation Zone, Academy, Women in pharma, Start-up market and Deals hub |
| Who visits, per the brochure | Purchasing and procurement, research and development, production, regulatory affairs and quality, general management and engineering. The brochure puts attendees with purchasing power at 74% |
| Admission | A free pass for registered trade visitors. No one under 18 is admitted, with an exception for infants in arms |
| Reusable builds | CPHI publishes a Better Stands programme that grades every space only booth as Bronze, Silver or Gold by how many of its elements are reused, with the stated aim of ending disposable stands at its events by 2030. How the Riyadh edition applies it is a question for the Customer Center |
Official sources we read: CPHI Middle East, organiser home page, Why exhibit, Exhibitor brochure 2027, Book your stand, Visitor and exhibitor FAQs, Plan your visit, Why attend, Connections Programme, Start-Up Market, Exhibitor warning, Nutraceuticals sector, CPHI Better Stands programme, BIO Middle East, BIO Middle East partnering. Sources last checked: 13 November 2026.
The open site gives the dates, the hours, the tracks and the way to book. The build rules are not there: height limits, rigging, floor loading, the service order forms and their deadlines live in the Customer Center, which the organiser's FAQ describes as the exhibitor manual and which opens with login details sent to contracted exhibitors. Nothing below is quoted from it. These are the matters that shape a pharma booth, with what the public pages do say about each. Send us your Customer Center documents with the brief and we design to them.
The exhibitor FAQ calls the Customer Center the exhibitor manual: the place for the key forms, the team badges and the deadlines, reached with login details emailed to the exhibitor. Find out who in your company received that email, because it is often procurement or the regional office and not the person briefing the booth. Until someone logs in, nobody can read a height limit or a submission date.
The same FAQ explains how a contractor is registered. The exhibitor opens Nominate your Contractor in the Customer Center, selects the company or adds it, and the contractor accepts the invitation in the Exhibitor Portal. On another page the organiser warns about unaffiliated vendors who solicit exhibitors, and asks that any doubtful contact be checked with its customer service. Choose your booth builder yourself and register it through the portal.
The public pages list no prices for floor space or for a shell scheme. They invite you to speak to the sales team and receive a proposal tailored to your needs. The single package described in the open is the Start-Up Market: booth space with a 1 kW socket, a tabletop stand, two chairs and the company name printed on it, for young companies that meet the organiser's criteria. Ask for the contents of any package in writing before a booth design starts.
What a pharmaceutical company may show, say or hand out at a trade show is governed by the regulator's rules and by the organiser's manual, and it differs by product type and by audience. That decision belongs to your regulatory affairs team, not to a designer. Give them the graphic texts, the list of packs for the display cases and any plan for samples early, and let them check all of it against the Customer Center. The booth is then drawn around what they approve.
A blister line, a capsule filler or a labelling machine on a booth needs power at the right rating, in most cases compressed air, a floor that carries the weight, a route into the hall and a barrier between moving parts and visitors. Each of these is a form and a deadline with the organiser or the venue. List every machine with its weight, footprint, electrical load and air demand on the day you book the space.
The venue lies north of Riyadh, away from suppliers and hardware shops. Whatever the booth may need on site has to travel with it: spare fixings, cables, touch up paint and a second copy of the graphics that matter most. Trucks follow the delivery slots the organiser issues, and the install days are planned around the access hours of the hall, not around city traffic. Where transport applies it is a named line in the quote.
We prepare the drawings and the paperwork the organiser and the venue ask for, and the approvals are theirs to give. A meeting floor on a second level is approved on a file of its own: our guide to double deck stand rules lists what organisers usually request, and the final month is set out in the exhibitor checklist.
The choice follows from how many conversations you need to hold at once and how private they are, far more than from the length of the product list.
The usual answer for a manufacturer or a distributor: a reception and a lit brand wall on the aisle, several small tables behind them, one or two closed rooms at the back and a store. Built in 6 to 8 weeks from brief to opening.
For a large manufacturer with a full diary. The ground level carries the reception, the product cases and the screens. The upper level is given over to tables and rooms, reached by a stair the reception controls. Allow 8 to 10 weeks and expect a separate structural approval.
A contract manufacturer, a laboratory or a logistics company sells capability, not packs. A reusable frame with fabric graphics lit from behind, a counter, a screen and a few seats is enough. New graphics take 2 to 4 weeks, and the kit returns to our storage until the next show.
The fitted space the organiser hands over, improved: printed wall panels in the exact brand colours, a lit counter, a locked display case and a proper table in place of the standard furniture. Ready in 2 to 3 weeks.
Many companies arrive under the banner of a country or an export council, with a shared roofline and a fixed panel layout. Inside that frame a company can still add, where the pavilion allows it, a lit header, a product case, a screen and a counter kept in order.
Open floor around the machine, a raised platform or a marked safety zone, services brought in under the floor, and a quiet table set away from the noise for the technical conversation that follows the demonstration.
The table counts back from opening day. In mid November 2026 every stage is still ahead, so the design can be settled without hurry. Two things make this calendar tighter than it looks. Ramadan and the Eid holiday are expected in February and March 2027, the very weeks in which a custom booth is briefed and approved, so plan internal sign-offs around shorter working days. And a pharma design passes a regulatory review that other industries never face, which belongs before the graphics go to print and not after. Brief a double deck by the middle of February and a single level custom booth by the first days of March. Each stage is explained in how long an exhibition stand takes.
| Date | Stage | Status |
|---|---|---|
| 1 March 2027 | The brief, the space contract and the exhibitor manual in hand: a custom stand starts here | Ahead |
| 15 March 2027 | Design approved, and drawings sent to the organiser where it asks for them | Ahead |
| 29 March 2027 | Last sensible start for a modular stand with new graphics | Ahead |
| 5 April 2027 | Graphics go to print on the final panel sizes | Ahead |
| 12 April 2027 | Full test assembly in the factory, and the last start for a rental kit from stock | Ahead |
| 19 April 2027 | Transport booked for the build window the organiser sets | Ahead |
| · | Installation in the hall, inside the hours written in the exhibitor manual | Per the exhibitor manual |
| 26 April 2027 | Opening day | Ahead |
| 28 April 2027 | Closing, then dismantling in the organiser's window | Ahead |
What is still realistic for this edition · 165 days to openingThere is time for a custom stand on the normal schedule, provided the design is approved on its date.
Status worked out on 12 November 2026.
The people who walk onto a CPHI Middle East exhibition stand are buyers, regulatory managers, production heads and business development teams. They have seen a tablet before. They come for a conversation, a document and a decision.
Count the meetings you expect in a day and draw the seats first. On a pharma booth most of the footprint goes to tables, and the product display takes a wall and a few cases. A booth laid out like a showroom fills with visitors who have nowhere to sit.
The counter at the front of the booth holds the diary. Whoever stands there checks the appointment, calls the right colleague, offers a seat, and books a walk-in visitor into the next free slot instead of sending him away. The same person keeps passers-by from occupying the tables.
Supply prices, licensing terms and technology transfer are not discussed with a competitor standing a step away. One or two rooms with a ceiling, a door and lined walls hold those talks. A frosted band on any glass keeps faces and laptop screens private from the aisle.
Arabic coffee, water and something small to eat, served from one compact bar between the reception and the tables, let a guest who arrives early wait in comfort. Plan it with a water arrangement the hall permits, a fridge on a permanent supply and a bin out of sight.
White and pale surfaces show every joint and every shadow, so they need flat panels, tight seams and even light. Brand colours are matched to the reference in the brand guide on the real materials, paint and print side by side, because two slightly different blues on neighbouring panels read as carelessness in an industry built on precision.
A molecular structure, a dosage form in close up or a photograph of the plant, printed on fabric and lit from behind, carries across the aisle without shouting. Keep claim texts off these large surfaces. Wording is what a regulatory review changes most often, and a lit image survives every revision.
Finished packs, inhalers, injection pens and device samples sit in glass or acrylic cases at eye level, lit from inside, each with a short caption. The cases lock, and what goes inside is a list your regulatory team signs. Where a real pack may not be displayed, the same team decides whether a dummy pack can take its place.
A buyer wants to see where the product is made. A silent film of the production lines, the clean rooms and the quality laboratory runs on one screen, and a second lists manufacturing certificates and approvals with their dates. Both carry captions, because nobody hears audio in an exhibition hall.
The organiser runs a Connections Programme in which pre-qualified buyers commit to a minimum of 8 to 10 scheduled meetings with exhibitors. The co-located BIO Middle East schedules partnering meetings of 25 minutes through a platform that opens one month before the event. Add your own invitations to distributors and partners, and the tables are booked before the booth is built.
CPHI Middle East is held in Malham, so what building a booth for a Riyadh hall involves, from the build window to the team on site, is on our page about exhibition stand builders in Riyadh. The other pharmaceutical, medical and industrial dates of the season are in the Saudi exhibitions calendar for 2026 and 2027. To plan the budget line by line, read exhibition stand cost in Saudi Arabia. A meeting floor on a second level has rules of its own, explained in double deck stand rules. Backlit graphics and lit cases are covered in exhibition stand lighting. A service company can start from modular and portable stands, the full build is described on custom exhibition booths, and each stage is dated in how long an exhibition stand takes.
None of them is about how the booth looks. All of them are about how it is used.
A booth of shelves for every product line, with a single table. By mid morning the table is taken, the next appointment stands in the aisle, and the sales director discusses a price leaning on the counter.
Booth graphics approved by marketing alone can be withdrawn by regulatory affairs after they are printed. Put the review in the schedule ahead of the print date, with the final texts, the pack list and any sample plan in one file.
A table at the edge of the booth invites anyone to sit down and lets anyone listen. Keep the conversation area behind the reception line, and turn the screens away from the aisle.
Compressed air, a higher electrical rating or a heavy lift requested late can be surcharged or refused, and that call is the organiser's. A machine that stands still on the booth for three days sells less than a film of it running.
According to the brochure, 75% of the 2024 exhibitors rebooked on site. If you expect to be among those who return, ask for a booth whose walls, floor and counters come apart and store for the following edition. That is also what the reusable tiers of Better Stands describe.
Buyers at this show arrange their days in advance, through the organiser's programmes and their own calendars. A team that waits for passing traffic mostly meets other suppliers. Send invitations with the booth number and proposed times weeks ahead.
Our stands and displays have stood for Kinan, the Heritage Commission, Saudia Holidays, Johnson & Johnson MedTech and Cartoon Network. We have more than one location in the Kingdom. Your project is built in our own factory, where design, CNC and laser cutting, joinery, paint, acrylic and large format print work under one roof, so the meeting room walls, the lit graphics and the display cases of one booth come from one team. Every booth is fully test assembled in the factory before it ships, and that is when white surfaces, colour matches and case lighting are looked at together. Our own team then installs it in Malham, stays for the opening and dismantles after the close. We are an independent builder working for exhibitors on the space they have booked. We are not an official contractor of CPHI Middle East, of its organiser or of the venue.





Asked by marketing managers, business development heads and export teams preparing for April 2027.
From 26 to 28 April 2027 at the Riyadh Exhibition and Convention Center in Malham, according to the organiser's site. The organiser is Informa Markets, the site presents the show as part of the Tahaluf brand, and the brochure states the patronage of the Ministry of Health.
The organiser's travel page gives visitor hours of 10 AM to 7 PM on the first two days and 10 AM to 6 PM on the last. Exhibitors are admitted from 9 AM. The closing hour for exhibitors on the last day differs between two official pages, so confirm it in the Customer Center.
In the Customer Center, an online portal the organiser describes as the exhibitor manual, holding the forms and deadlines for the show. Login details are emailed to the contracted exhibitor. It is not on the open web, and nothing on this page is quoted from it.
The organiser's FAQ describes the route: the exhibitor nominates a contractor in the Customer Center, and the contractor accepts in the Exhibitor Portal. A builder of your choice, as we would be, is registered that way. Ask your account manager which documents a nominated contractor has to submit, and by when.
Yes. A custom booth takes 6 to 8 weeks from brief to opening, and an island or double deck 8 to 10 weeks. In mid November 2026 the opening is a little over five months away, so both sit on the normal schedule, provided the regulatory review of the graphics is planned in.
It depends on the number of appointments in a day and on how many run at the same time. On 18 square metres a counter, a display case and a small seating group fit. On 36 there is room for a closed room, several tables and a hospitality point. Tell us the diary you expect and the plan is drawn from the seats outward.
That is not a question a booth builder can answer. Product promotion and samples at a pharmaceutical show follow the regulator's rules and the organiser's manual, and your regulatory affairs team decides what applies to your products. Once they have a list, the cases, captions and counters of the booth are designed to it.
Start from the pavilion's own rules, because the body that runs it fixes the panel sizes and what may be added. Within them, a lit header, a single product case, a screen with your plant film and a counter kept clear do more than extra posters. Staff who greet visitors in the aisle count as much as the booth itself.
Usually yes, if its services are ordered in time. Power, compressed air, floor loading, the lifting route and the safety barrier are each requested on the organiser's forms by their deadlines. Send the data sheet of the machine with the brief, so the platform and the service points are drawn around it.
The space size and its open sides, the number of tables and closed rooms, a list of what goes on display or has to run, and your Customer Center documents once you have them. An itemised quote follows within 24 hours, and where transport applies it is a named line in that quote.
Send your space size, the open sides and the number of meetings you expect in a day. Within 24 hours you receive an itemised quote, a first concept for the booth and a schedule counted back from 26 April. Call 0567069088 or write to us on WhatsApp.
Most projects here combine more than one service. This is the full range, with the ones closest to this page first.