Big 5 Construct Saudi, the construction show most of the market simply calls Big 5 Saudi, runs twice in 2027 at Riyadh Front Exhibition and Conference Center: 24 to 27 May for architecture and finishes, and 19 to 22 September for construction and building services. dmg events organises both. A Big 5 Saudi exhibition stand has to carry real product with real weight: stone slabs, facade panels, doors that open and close, chillers, tools a buyer wants to pick up. That turns the booth from a photo backdrop into a structure with calculated loads, delivery slots and a table for technical talk. This page helps you choose the edition that fits your product category, lists what to ask the organiser before a heavy sample is shipped, and counts the build back from both opening dates. Design, fabrication in our own factory and installation by our own team, from the first sketch to dismantling.
Every line below was read on the organiser's own pages on the date printed under the table. The two editions are booked through separate forms, so check which one your space contract names before a booth is sketched. If dmg events moves a date, these tables move with the monthly update of our Saudi exhibitions calendar.
| Dates | 24 to 27 May 2027 |
|---|---|
| Venue | Riyadh Front Exhibition and Conference Center |
| City | Riyadh |
| Organiser | dmg events |
| Sector | Building materials and design |
| Official page | big5constructsaudi.com |
| Dates | 19 to 22 September 2027 |
|---|---|
| Venue | Riyadh Front Exhibition and Conference Center |
| City | Riyadh |
| Organiser | dmg events |
| Sector | Construction, facilities and HVAC |
| Official page | big5constructsaudi.com |
| Official name | Big 5 Construct Saudi. Exhibitors and visitors usually shorten it to Big 5 Saudi |
|---|---|
| Opening hours | 4:00 PM to 10:00 PM, listed on the organiser's site next to the 2027 dates |
| May edition | Architecture and Finishes, co-located with Marble and Stone Saudi Arabia, Urban Design and Landscape Saudi Arabia, and Windows, Doors and Facades Saudi Arabia |
| September edition | Construction and Building Services, co-located with FM and Clean Saudi Arabia and HVACR Saudi Arabia |
| Sectors listed for both editions | Metal, Steel and Aluminum, Smart Building and Special Construction |
| Admission | Free for trade and industry professionals. Visitors under 18 are not admitted |
| Event licence | The organiser states event licence number 26/5656 |
| Scale the organiser reports | More than 65,000 qualified visitors, 2,200 exhibiting companies and 50 exhibiting countries, counted across two editions |
| Launched | 2010,according to the organiser's About page |
| Exhibitor manual | An online manual, opened with login details the organiser emails to contracted exhibitors |
Official sources we read: Big 5 Construct Saudi, organiser home page, Exhibiting information for the two 2027 editions, Why exhibit, May 2027, Why exhibit, September 2027, Organiser FAQs for exhibitors, About Big 5 Construct Saudi, Press release on the 2026 edition of 30 August to 2 September. Sources last checked: 12 November 2026.
In 2027 the organiser splits the show into two focused events, each aimed at a different stage in the life of a building. The rules for building a booth are not on the open web: they sit in the Online Exhibitor Manual, behind a login. So the cards below start with what the public pages say about each edition, move to what the organiser's exhibitor FAQ confirms (on the day we read it, that FAQ still carried the 2026 dates), and end with the questions a heavy exhibit should raise before anything is shipped.
The edition of 24 to 27 May is themed Architecture and Finishes. Its listed sectors include building interiors and finishes, kitchen and bathroom, paint and coating, glass production and machinery, marble and stone, urban design and landscape, construction tools and protective equipment, and windows, doors and facades. If a buyer chooses your product by eye and by hand, this is your edition.
The edition of 19 to 22 September is themed Construction and Building Services. The organiser lists concrete and cement, mechanical, electrical and plumbing, heating, ventilation, air conditioning and refrigeration, facility management, digital construction, offsite and modular construction, and solar products. If an engineer chooses your product from a data sheet, book this one.
Metal, steel and aluminum, smart building and special construction are named on the exhibitor pages of both editions. A steel or aluminum producer can follow its buyers: architects and facade consultants in May, contractors and services engineers in September, or both audiences with a single booth structure.
The edition of 30 August to 2 September 2026 ran with Heavy Saudi Arabia and Totally Concrete Saudi Arabia beside it, and its sponsor list named an Outdoor Area Sponsor. When we read the site, the September 2027 pages listed FM and Clean Saudi Arabia and HVACR Saudi Arabia as the co-located events. Machinery exhibitors should ask the sales team where plant sits in 2027 and whether outdoor space is sold.
The organiser's FAQ sends exhibitors to an Online Exhibitor Manual, opened with details that arrive by email. According to that FAQ, exhibitor badges are registered there and the company listing is updated there, and the page links a deadline checklist, the exhibiting terms and the route for ordering electricity. Share your access with the brief: every height and date on the booth drawing is taken from it.
The same FAQ says build-up and tear-down timings vary by hall, and that the manual gives the dates and access times for your own stand location. The hall on your space contract is therefore the first thing we ask for. It decides the day the truck is booked and the hours the install team has to put your booth up.
The public booking pages do not publish stand packages or rates. Each edition has its own booking form, and the organiser says its team then confirms availability, pricing and next steps. As at most trade shows, expect a choice between a fitted shell scheme and bare floor, and confirm which is offered at your position before any booth is designed.
Before a stone slab, a chiller or a machine travels, put these to the organiser in writing: the floor loading limit in your hall, who operates forklifts and cranes during build-up and how a slot is reserved, when heavy exhibits may enter relative to the booths around them, and the size of the hall door on your route.
Thinking of a second level? Height limits, structural drawings and the approval route are set by the organiser and the venue, and the manual states them for each edition. Our guide to double deck exhibition stand rules explains what is normally requested before an upper floor is signed off.
At a construction show the booth type follows from the weight and size of the product, and from how many people need to sit down over a drawing. These are the types we would put in front of a Big 5 exhibitor.
Open on every side, with the range arranged by system: a facade bay, a roofing bay, a flooring bay. The brand sits high on a central core that also hides the store. Allow 8 to 10 weeks from brief to opening, because an island booth is drawn, approved and test assembled as a structure.
A booth on bare floor, fitted with load bearing walls made for your samples: tiles and stone at hand height, cladding panels at full size, doors and windows in working frames. Each wall is designed around the weight of what hangs on it, which is why we ask for the sample list before the first sketch.
Product and demonstrations at ground level, and above them a quiet floor for consultants and procurement teams. It adds meeting space without a bigger plot. A double deck booth needs structural drawings and the organiser's approval, so plan 8 to 10 weeks and an early conversation.
A distributor carries many brands and changes the line-up every season. A modular frame with printed panels and adjustable shelving gives each principal a bay of its own, and the same kit can return for the next edition with new graphics in 2 to 4 weeks.
If the organiser hands you a fitted shell, we add printed walls, a counter, shelving for samples and proper lighting, with nothing fixed into the system panels. It takes 2 to 3 weeks and gives a first time exhibitor a booth that reads clearly from the aisle.
For chillers, air handling units, pumps or site machinery: a tall branded backdrop, a floor covering chosen for the load, and open space so engineers can walk right round the unit. Here the booth is a frame around the machine, and the weight of the machine sets the plan.
Each row is counted back from the opening date the organiser publishes. When this page was written every stage of both editions still lay ahead, so a custom booth, an island or a double deck can all be planned on a normal schedule. The first row assumes a custom build of 6 to 8 weeks from brief to opening. An island or a second level takes 8 to 10, so start those before that row. What each stage adds to the budget is set out in our guide to exhibition stand cost in Saudi Arabia.
| Date | Stage | Status |
|---|---|---|
| 29 March 2027 | The brief, the space contract and the exhibitor manual in hand: a custom stand starts here | Ahead |
| 12 April 2027 | Design approved, and drawings sent to the organiser where it asks for them | Ahead |
| 26 April 2027 | Last sensible start for a modular stand with new graphics | Ahead |
| 3 May 2027 | Graphics go to print on the final panel sizes | Ahead |
| 10 May 2027 | Full test assembly in the factory, and the last start for a rental kit from stock | Ahead |
| 17 May 2027 | Transport booked for the build window the organiser sets | Ahead |
| · | Installation in the hall, inside the hours written in the exhibitor manual | Per the exhibitor manual |
| 24 May 2027 | Opening day | Ahead |
| 27 May 2027 | Closing, then dismantling in the organiser's window | Ahead |
What is still realistic for this edition · 193 days to openingThere is time for a custom stand on the normal schedule, provided the design is approved on its date.
| Date | Stage | Status |
|---|---|---|
| 25 July 2027 | The brief, the space contract and the exhibitor manual in hand: a custom stand starts here | Ahead |
| 8 August 2027 | Design approved, and drawings sent to the organiser where it asks for them | Ahead |
| 22 August 2027 | Last sensible start for a modular stand with new graphics | Ahead |
| 29 August 2027 | Graphics go to print on the final panel sizes | Ahead |
| 5 September 2027 | Full test assembly in the factory, and the last start for a rental kit from stock | Ahead |
| 12 September 2027 | Transport booked for the build window the organiser sets | Ahead |
| · | Installation in the hall, inside the hours written in the exhibitor manual | Per the exhibitor manual |
| 19 September 2027 | Opening day | Ahead |
| 22 September 2027 | Closing, then dismantling in the organiser's window | Ahead |
What is still realistic for this edition · 311 days to openingThere is time for a custom stand on the normal schedule, provided the design is approved on its date.
Status worked out on 12 November 2026.
Buyers at a construction show test with their hands. They knock on a panel, lift a tile, swing a door. A good booth lets them.
Tiles, stone and cladding belong on the wall between waist and eye level, fixed so that an edge or a corner is exposed and a visitor can feel the thickness and the surface. Each piece carries a small label with its name, finish and code, so a specifier can note it without asking.
A door is judged by how it closes. Frames are set into the booth as free standing units, braced inside the wall, so visitors can work the handle, the hinge and the seal. Tell us the weight of each leaf early: the bracing is designed from that figure.
Specifiers and contractors arrive with drawings. Give them a table at working height with good light, a screen for details, spec sheets within reach and a drawer of small samples, set back from the aisle. Doors open at 4:00 PM, so many site engineers come after their working day: keep a technical person on the booth until closing.
Organisers commonly restrict cutting, grinding and anything that throws dust or sparks inside a hall, and the manual for your edition will say exactly what applies. Where a live demonstration is permitted, we build an enclosed bench with clear acrylic screens, and the tool runs on the extraction unit its maker brings.
A machine or a block of stone is positioned before the booth goes up around it, not after. The drawing marks its footprint, its weight and its route from the hall door, and the delivery is booked for the start of the build window your hall is given.
A group with a finishes division and a building services division can exhibit in May and again in September. The frame, the counters and the lighting rest in our storage between the two, and only the graphics and the samples change. New graphics are printed in 1 to 5 working days.
Both editions are held in Riyadh, and our page on exhibition stand building in Riyadh describes how we work in the city's venues. The other construction and industry dates of the season, each tied to its official source, are in the Saudi exhibitions calendar for 2026 and 2027. To weigh a custom build against a system you rent or own, read modular and portable booths, and for the complete service see custom exhibition booths. Every stage of the countdown is explained in how long an exhibition stand takes, an upper floor in double deck stand rules, and the final month in the exhibitor checklist.
Every one of these begins as a question nobody put to the organiser in time.
May suits the calendar, so the chiller goes to May. But the May floor is themed for architecture and finishes, and the services engineers you want are the audience of September. Match the edition to the product category first and to the diary second.
A slab that arrives with no confirmed floor loading limit and no lifting slot can wait on the truck while the hall fills up around your plot. The weight question goes to the organiser with the booking, not with the delivery note.
Stone leaned against a wall, tiles locked in a cabinet, a facade panel hung above head height. A buyer who cannot handle the material walks on to the booth where he can.
High stools at the aisle are fine for a greeting. A contractor who unrolls a drawing needs a table, light and some quiet. On a booth without them the technical conversation is postponed, and it is rarely resumed.
A tile cutter or a grinder draws a crowd, and it can be stopped on opening day if the hall rules forbid it. Read the manual, have the demonstration approved in writing, then enclose it.
Build-up and tear-down times differ by hall at this show. A team that books its truck from another exhibitor's schedule can turn up on the wrong day for its own booth.
Our stands and displays have stood for Kinan, the Heritage Commission, Saudia Holidays, Johnson & Johnson MedTech and Cartoon Network. Design, CNC and laser cutting, joinery, paint, acrylic and large format print sit under one roof, and every booth is fully test assembled in our own factory before it ships. We have more than one location in the Kingdom, and the team that builds your booth installs it, stays for the opening and dismantles it. Where transport applies it is a named line in the quote. We are an independent builder working for exhibitors on the space they booked with dmg events, not an official contractor of the show. Permits and approvals belong to the organiser and the venue, and we prepare the drawings and paperwork they ask for.





Asked by manufacturers and distributors before they brief a builder.
The organiser lists two editions at Riyadh Front Exhibition and Conference Center: 24 to 27 May 2027 and 19 to 22 September 2027. Its site gives the opening hours as 4:00 PM to 10:00 PM. Admission is free for trade and industry professionals, and visitors under 18 are not admitted.
May is themed Architecture and Finishes and runs with the marble and stone, urban design and landscape, and windows, doors and facades events. September is themed Construction and Building Services and runs with the FM and Clean and HVACR events. Choose by the buyer who specifies your product, and ask the sales team if your category is listed for both.
No. It is an online manual behind a login the organiser emails to exhibitors, and the organiser's FAQ refers build timings, badges and listings to it. Nothing on this page is quoted from the manual. We read your copy before the booth is drawn.
Yes, when it is designed for both plots from the start. The structure, counters and lighting stay in our storage between May and September, and the graphics and samples are changed for the second audience. A modular booth with new graphics takes 2 to 4 weeks.
We start from the weight and footprint of each piece. Those go on the drawing, the organiser confirms the floor loading and the lifting arrangement for your hall, and the wall or base is made for that load and test assembled in our factory. Lifting inside the hall follows the organiser's rules.
That is decided by the organiser and the venue, and the manual states what is allowed. Where a demonstration is approved, we design an enclosed bench with clear screens and work out the power order from your equipment list. Dust, sparks and noise are the points to raise first.
A custom booth takes 6 to 8 weeks from brief to opening, and an island or a double deck 8 to 10. The countdown table on this page turns those weeks into calendar dates for each edition. Briefing earlier costs nothing and leaves room for the organiser to review the drawings.
The sponsor list of the 2026 edition held from 30 August to 2 September named an Outdoor Area Sponsor, so an outdoor area existed that year. Whether one is sold in 2027, in which edition and on what terms, is for the organiser's sales team to confirm. If it is, tell us early: an outdoor booth changes the materials, the shade and the way the structure is held down.
Approvals are given by the organiser and the venue. We prepare the booth drawings and the technical information they request, and we tell you which orders, such as electricity, the exhibitor has to place and by which date on the organiser's deadline checklist.
The edition, your hall and stand number, the plot size and open sides, a list of samples with sizes and weights, and the number of meeting seats you want. An itemised quote and a first concept follow within 24 hours.
Send the edition, your plot size and the list of what you will show, with weights. Within 24 hours you receive an itemised quote, a first concept for your Big 5 Saudi exhibition stand and a schedule counted back from the opening date. Call 0567069088 or use one of the buttons below.
Most projects here combine more than one service. This is the full range, with the ones closest to this page first.